Questionnaire

Please fill out the questionnaire below so that we can provide a suitable proposal for your project. We ask you to answer those questions that you can and provide other materials that can help us.

    1) Contact person responsible for the specified information
    2) Boilerhouse
    2.1 Heat-transfer agent:
    2.2 Parameter requirements:
    2.3 Fuel supply principle:
    2.4 Fuel:
    2.5 Ash handling:
    2.6 Heat Exchanger Cleaning System:
    2.7 Fuel composition:
    3) Heat utilization
    3.1 Room heating:
    Dimensions of the heated room:
    3.2 Hot water supply:
    The required amount of hot water:
    3.3 Heating for the drying chambers:
    Chamber capacity:
    3.4 Heat utilization for other technological purposes:
    4) Construction and installation work
    5) Additional equipment

      1) General project data
      Client / Investor:
      Project name:
      Phone:
      E-mail:
      Platform Location:
      Expected implementation schedule (approval of the plan, signing of the contract, building permit, delivery of the project):
      Reconstruction / new installation:
      2) Planning
      The current stage of the project (preliminary draft / plan approval):
      The stage of obtaining environmental permits (IPPC, Environmental Impact Assessment, etc.):
      3) Installation site
      Location (address, rural / urban)?:
      Existing / New building (available data in case of existing building):
      Stage of construction planning (plan not yet submitted / already submitted / approved). In the case of an already approved design permit, please provide the plan / plan of the area and the height of the building, or, if planning is underway, indicate the general dimensions of the building.:
      Are there any restrictions regarding the building (height / length of the boiler room, size of the place for the condensing unit, size of the room for storing fuel, orientation of the building, etc.)?:
      Are there any specific geographical or environmental restrictions (noise / emissions, roads, etc.)?:
      Fuel specification
      Fuel type:
      Type:
      Qty (t/a):
      Calories (MJ/kg):
      Density (kg/m3):
      Size/Granulation (mm):
      Humidity (%m):
      Ash content (% m):
      C (%m):
      H (%m):
      O (%m):
      N (%m):
      S (%m):
      Cl (%m)]:
      F (%m):
      Metals (mg/kg):
      (%m) – percent by weight
      Fuel Preparation (Processing/Grinding Plant - On/Off Site):
      Type and frequency and amount of fuel for transportation:
      Additional requirements for fuel preparation (grinding):
      Changes in fuel supply depending on preliminary or final analysis (CV, humidity, ash, composition, element-wise):
      Required storage capacity (uptime hours at 100% load):
      4) System specification
      General information:
      Available data in case of reconstruction:
      Fuel power
      Factory availability (24 hours / day, days / weeks, hours / year?):
      Energy/Steam/Heat Production:
      System priority (waste reduction/disposal, electricity production, heat/steam production, etc.)?:
      Details of electricity needs, heat/steam (process steam or hot water parameters (quantity/pressure/temperature), heat use: central heating, greenhouse heating, etc.)?:
      System requirements (maximum output electric power or efficiency, minimum/maximum/average power of process steam or thermal load, etc.)?:
      Capacitor:
      Preferred condensing unit (direct air/water cooled condenser, direct air/water cooled condenser with cooling tower, other):
      Water availability for a possible water-cooled condenser (groundwater/river/quantity/temperature):
      Flue gas / water / noise / emissions:
      Dust:
      Total organic carbon TOC:
      Hydrochloric acid (HCl):
      Hydrofluoric acid (HF):
      Sulphur dioxide (SO2):
      Nitrogen oxides (NO2):
      Carbon monoxide (CO):
      Heavy metals:
      Cd and Ti (total):
      Sb,As,Pb,Cr,Co,Mn,Ni,V,Sn (total):
      Hg:
      Dioxins and furans:
      Concentrations are given at 11% O2 by volume in waste gases and 6% for biofuels
      Are there any special requirements regarding flue gas emissions?:
      Are there any special requirements regarding wastewater, noise or any other emissions?:
      Other:
      Are there any agreements / arrangements with other suppliers of individual components?:
      Supply of auxiliary fuel for starting and WID requirements (NG, LPG):
      5) Other
      Are there any special requirements for operation and maintenance?:
      Are there any financial / investment requirements?:
      Additional comments:
      Place and date:
      Who filled out the document:
      Callback